Research work · 1950
Stack venting of plumbing fixtures
J. Lawrence French
Abstract
This report describes tlie methods used and the results oi)tained in an investigation of the adequacy of stack venting a gi'oup of plumbing fixtures on the top floor of a buiUling.Trap-seal losses of stack-vented fixtures in an experimental installation are reported, a test loading having a reasonable probability of occurrence is developed, and a criterion of satisfactory trap-seal loss is proposed.The experimental i-esults are interpreted in the lislit of the adopted test loading and the adopted permissible trap-seal loss.And, finally, con- clusions in a form suitable for the use of code-vpriting authorities are made.
DOI: 10.6028/nbs.bms.118